by JonBen
Donkler wrote:
Can you not advance the wheel twice even if it is the first advance that that grinds up the worker?
The first advancement can push works off. The second advancement can not.
I have never seen a worker get pushed off. Here is a possible contrived situation. The upper levels of Chichen Itza are complete. A timely double push forces a worker into this upper region. The lower regions are all filled in before the worker arrives at the final space.
Other than that, maybe if someone has 6 workers and messes up the more complicated timing of put and pull turns due to having workers at many different stages on many different wheels.